This is this fantastic levade between pillars. This commission took me a nit more time as usual because I had to re-built it after the "big freeze" of December and January. It was originally done in clay but the clay froze and cracked too many times. I have re-done the work from scratch with plasteline which is harder to work with but it will sustain cold weathers.
here is the last pictures so far ( I have been slow posting those pictures) but here they are:
No comments:
Post a Comment